Industrial Engineering and Production Management Online Quiz


1. An event is a function of two or more activities.
Correct
Incorrect

2. The allowed time for a job equals standard time plus
Interference allowance
Policy allowance

3. Follow-up prescribes the sequence of operations to be followed.
Correct
Incorrect

4. Micro-motion study involves following number of fundamental hand motions
12
16

5. Break-even analysis represents the relationship between cost and volume.
True
False

6. Percent idle time for men or machines is found by
Work study
Work sampling

7. Slack may be positive, zero or negative.
Agree
Disagree

8. In which of the following layouts, the lines need to the balanced
Process layout
Product layout

9. Generally PERT is preferred over CPM for the purpose of project evaluation.
Yes
No

10. Basic motion time study gives times for basic motions in ten thousandths of
Second
Minute

11. A low unit cost can be obtained by following
Product layout
Functional layout

12. Father of industrial engineering is
Jack Gilbert
Gantt

13. Acceptance sampling is widely used in
Batch production
Mass production

14. In the perpetual inventory control, the material is checked when it reaches its
Minimum value
Maximum value

15. In the Halsey 50-50 plan, the following are rewarded more
Past good workers
Past poor workers

16. Queueing theory is associated with
Waiting time
Production time

17. In perpetual inventory control, the material is checked as it reaches its
Minimum value
Maximum value

18. Bar charts are suitable for
Major works
Minor works

19. The time of completing a project in network analysis is given by following time of the critical activity meeting at the final triode
Early finish
Early start

20. The performance of a specific task in CPM is known as
Event
Activity

     Score =