Practice Test: Question Set - 05
1. The hardness of a grinding wheel is determined by the
- (A) Hardness of abrasive grains
- (B) Ability of the bond to retain abrasives
- (C) Hardness of the bond
- (D) Ability of the grinding wheel to penetrate the
work piece
2. The cutting force in punching and blanking operations mainly depends on
- (A) The
modulus of elasticity of metal
- (B) The
shear strength of metal
- (C) The
bulk modulus of metal
- (D) The
yield strength of metal
3. In ECM, the material removal is due to
- (A) Corrosion
- (B) Erosion
- (C) Fusion
- (D) Ion
displacement
4. Allowance in limits and fits refers to
- (A) Maximum
clearance between shaft and hole
- (B) Minimum
clearance between shaft and hole
- (C) Difference
between maximum and minimum sizes of hole
- (D) Difference
between maximum and minimum sizes of shaft
5. Green sand mould indicates that
- (A) Polymeric
mould has been cured
- (B) Mould
has been totally dried
- (C) Mould
is green in colour
- (D) Mould
contains moisture
6. In a gating system, the ratio 1: 2: 4 represents
- (A) Sprue
base area: runner area: ingate area
- (B) Pouring
basin area: ingate area: runner area
- (C) Sprue
base area: ingate area: casting area
- (D) Runner
area: ingate area: casting area
7. Two streams of liquid metal which are not hot enough to fuse properly result into a casting defect known as
- (A) Cold shut
- (B) Swell
- (C) Sand wash
- (D) Scab
8. Which of the following engineering materials is the most suitable candidate for hot chamber die casting?
- (A) Low
carbon steel
- (B) Titanium
- (C) Copper
- (D) Tin
9. Volume of a cube of side ‘l’ and volume of a sphere of radius ‘r’ are equal. Both the cube and the sphere are solid and of same material. They are being cast. The ratio of the solidification time of the cube to the same of the sphere is
- (A) (4Ï€/6)³ × (r/l)⁶
- (B) (4Ï€/6) × (r/l)²
- (C) (4Ï€/6)² × (r/l)³
- (D) (4Ï€/6)² × (r/l)⁴
10. An expendable pattern is used in
- (A) Slush
casting
- (B) Squeeze
casting
- (C) Centrifugal
casting
- (D) Investment
casting
11. Match the items of List-I (Equipment) with the items of List-II (Process) and select the correct answer using the given codes.
List-I (Equipment)
|
List-II (Process)
|
P. Hot Chamber Machine
|
1. Cleaning
|
Q. Muller
|
2. Core making
|
R. Dielectric Baker
|
3. Die casting
|
S. Sand Blaster
|
4. Annealing
|
5. Sand mixing
|
- (A) P-2, Q-1,
R-4, S-5
- (B) P-4, Q-2,
R-3, S-5
- (C) P-4, Q-5,
R-1, S-2
- (D) P-3, Q-5,
R-2, S-1
12. Misrun is a casting defect which occurs due to
- (A) Very
high pouring temperature of the metal
- (B) Insufficient
fluidity of the molten metal
- (C) Absorption
of gases by the liquid metal
- (D) Improper
alignment of the mould flasks
13. Hardness of green sand mould increases with
- (A) Increase
in moisture content beyond 6 percent
- (B) Increase
in permeability
- (C) Decrease
in permeability
- (D) Increase
in both moisture content and permeability
14. The primary purpose of a sprue in a casting mould is to
- (A) Feed
the casting at a rate consistent with the rate of solidification
- (B) Act
as a reservoir for molten metal
- (C) Feed
molten metal from the pouring basin to the gate
- (D) Help
feed the casting until all solidification takes place
15. Shrinkage allowance on pattern is provided to compensate for shrinkage when
- (A) The temperature of liquid metal drops from
pouring to freezing temperature
- (B) The metal changes from liquid to solid
state at freezing temperature
- (C) The temperature of solid phase drops from
freezing to room temperature
- (D) The temperature of metal drops from pouring to
room temperature