Practice Test: Question Set - 10
1. In process layout
- (A) Handling
and backtracking of materials is too much
- (B) Production
control is more difficult and costly
- (C) Routing
and scheduling is more difficult
- (D) All
of the above
2. Choose the wrong statement. Motion study is used for
- (A) Improving a work
method
- (B) Improvising a work
method
- (C) Designing a work
method
- (D) Reducing inventory
costs
3. Routing prescribes the
- (A) Flow of material in
the plant
- (B) Proper utilization of
man power
- (C) Proper utilization of
machines
- (D) Inspection of final
product
4. The objective of time study is to determine the time required to complete a job by
- (A) Fast worker
- (B) Average worker
- (C) Slow worker
- (D) New entrant
5. The main objective of work measurement is to
- (A) Plan
and schedule of production
- (B) Formulate
a proper incentive scheme
- (C) Estimate
the selling prices and delivery dates
- (D) All of the
above
6. Halsey plan of wage incentive
- (A) Is
not applied to all level of workers
- (B) Is applied
to all level of workers
- (C) Does
not guarantee minimum wage
- (D) Is
based upon efficiency of worker
7. The two bin system is concerned with
- (A) Ordering procedure
- (B) Forecasting sales
- (C) Production planning
- (D) Despatching and
expediting
8. Pick up the correct statement from the following
- (A) Programmer evaluation
and review technique is event oriented
- (B) Programmer evaluation
and review technique is not event oriented
- (C) Critical path method
is event oriented
- (D) None of the above
9. The main object of scientific layout is
- (A) To
produce better quality of product
- (B) To utilize maximum floor area
- (C) To minimize production delays
- (D) All of these
10. Pick up the correct statement from the following
- (A) If the float is
positive and the activity is delayed by a period equal to its total float, the
completion of project in not delayed
- (B) If the float of an activity is negative,
delay in its performance is bound to delay the completion of project
- (C) If the float of an activity is zero, the
activity is critical and any delay in its performance will delay the whole
project
- (D) All of the above
11. In a line organization
- (A) Responsibility
of each individual is fixed
- (B) Discipline
is strong
- (C) Quick
decisions are taken
- (D) All
of these
12. In a PERT chart
- (A) All activities should
be numbered
- (B) Only important
activities should be numbered
- (C) Only critical
activities are numbered
- (D) Only selected
activities are numbered
13. In break even analysis, total cost consists of
- (A) Fixed
cost + sales revenue
- (B) Variable
cost + sales revenue
- (C) Fixed
cost + variable cost
- (D) Fixed
cost + variable cost + profit
14. Micro-motion study is
- (A) Enlarged view of
motion study
- (B) Analysis of one stage
of motion study
- (C) Minute and detailed
motion study
- (D) Subdivision of an
operation into therbligs and their analysis
15. Time study is carried out
- (A) By
finding all the significant informations regarding the job, work place and
machine tool etc
- (B) By breaking
up each operation into small elements which are measurable with the help of the
measuring device accurately
- (C) By
observing and recording the time taken by the operator for an operation
- (D) All of the
above