Practice Test: Question Set - 10
1. If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the expected time of the activity, is
- (A) (a + m
+ b)/6
- (B) (a + 2m
+ b)/6
- (C) (a + 4m
+ b)/6
- (D) (a + 5m
+ b)/6
2. Consider the following statements for a power shovel:
(i) Output can be increased by reducing the
angle of swing for a given depth of cut.
(ii) For a given angle of swing, output will
be maximum at optimum depth of cut.
(iii) Output can be increased by keeping the
depth of cut less than optimum depth.
(iv) Output can be increased by increasing
the size of shovel.
Of these statements
- (A) (ii), (iii) and (iv) are correct
- (B) (i), (ii) and (iv) are correct
- (C) (i), (iii) and (iv) are correct
- (D) (i) and (iv) are correct
3. If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity respectively, the expected time t of the activity will be
- (A) to
+ 3tm+ tp/3
- (B) to
+ 4tm+ tp/4
- (C) to
+ 4tm+ tp/5
- (D) to
+ 4tm+ tp/6
4. The most suitable type of equipment for compaction of cohesive soils is
- (A) Smooth-wheeled rollers
- (B) Vibratory rollers
- (C) Sheep foot rollers
- (D) Tampers
5. If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be
- (A) Started 5
days later
- (B) Completed 5
days later
- (C) Performed at
slower rate in 15 days
- (D) All the
above
6. Rolling resistance of a wheel depends upon
(i) Vehicle load
(ii) Grade
(iii) Ground conditions
Of these statements
- (A) Only (i) is correct
- (B) (i) and (ii) are correct
- (C) (i) and (iii) are correct
- (D) (ii) and (iii) are correct
7. A Milestone chart
- (A) Shows
the interdependencies of various jobs
- (B) Depicts the
delay of jobs, if any
- (C) Points
outgoing ahead of schedule of jobs, if any
- (D) None of
these
8. Earliest finish of an activity is always
- (A) Greater than earliest event time of the following
node
- (B) Less than earliest event time of the following node
- (C) Less than or equal to earliest event time of the
following node
- (D) Greater than or equal to earliest event time of the
following node
9. Critical path lies along the activities having total float
- (A) Positive
- (B) Negative
- (C) Zero
- (D) Same
10. If the scheduled completion time of a project is more than the earliest expected time for completion of the project, then the probability of completion of the project within the scheduled completion time will be
- (A) 50 %
- (B) Less than 50 %
- (C) More than 50 %
- (D) 100 %
11. The critical activity has
- (A) Maximum
float
- (B) Minimum
float
- (C) Zero float
- (D) None of
these
12. For excavating utility trenches with precise control of depth, the excavation equipment used is
- (A) Hoe
- (B) Shovel
- (C) Dragline
- (D) None of the above
13. PERT analysis is based on
- (A) Optimistic
time
- (B) Pessimistic
time
- (C) Most likely
time
- (D) All the
above
14. The most popular type of organization used for Civil Engineering Constructions, is
- (A) Line
organization
- (B) Line
and staff organization
- (C) Functional
organization
- (D) Effective
organization
15. The probability of completion of any activity within its expected time is
- (A) 50 %
- (B) 84.1 %
- (C) 99.9 %
- (D) 100 %