1. For the construction of buildings, the subheads of the estimate are
- (A) Earthwork,
Concrete work, Brick work
- (B) Brickwork,
Stone work, Roofing
- (C) Brickwork
Flooring, Wood work, Steel work
- (D) All the
above
2. Pick up the correct statement from the following:
- (A) Pointing is
measured in sq.m
- (B) Plastering
is measured in sq.m
- (C) Glazing is
measured in sq.m
- (D) All the
above
3. The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is
- (A) ⅓ × (b -
rd)²/(r - s)
- (B) ⅓ × (b -
rd)²/(r + s)
- (C) ½ × (b +
rd)²/(r - s)
- (D) ⅓ × (b -
rd)²/(s - r)
4. Pick up the correct statement from the following:
- (A) If the bed
level is above N.S.L. the canal is called fully in baking and the berms are
designed as 3 d where d is full supply depth
of water (F.S.D.)
- (B) Area of
canal in cutting = BD + Sd2 where B = bed width, d =
depth of cutting and S is the side slope
- (C) If F.S.L. is
above N.S.L the canal is called partly in cutting and partly in filling and
berms are designed as 2d where d is full supply
depth
- (D) All
the above
5. Pick up the incorrect statement from the following:
- (A) No deduction
is made for the volume occupied by reinforcement
- (B) No deduction
is made for the openings upto 0.1 sq.m
- (C) No deduction
is made for volumes occupied by pipes, not exceeding 100 sq.cm in cross-section
- (D) None of
these
6. The value of 'B' of Indian type W.C. shown in the given figure is:
- (A) 45 cm
- (B) 50 cm
- (C) 30 cm
- (D) 25 cm
7. Pick up the excavation where measurements are made in square meters for payment.
- (A) Ordinary
cuttings up to 1 m
- (B) Surface
dressing up to 15 cm depths
- (C) Surface
excavation up to 30 cm depths
- (D) Both (b) and
(c)
8. As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
- (A) 1.80 liters
for 5 to 10 users
- (B) 1.20 liters
for 15 users
- (C) 1.35 for 20
users
- (D) All the
above
9. In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
- (A) Breadth of
the wall
- (B) Half breadth
of wall on each side
- (C) One fourth
breadth of wall on each side
- (D) None of
these
10. The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
- (A) 1.5 m3
- (B) 2.5 m3
- (C) 3.5 m3
- (D) 5.0 m3