Practice Test: Question Set - 04
1. The person communicating with the manager to identify information needs is the
- (A) Executive
vice-president
- (B) Vice-
president of information system
- (C) Programmer
- (D) System
analyst
2. Changes made periodically to a system, after its implementation, is known as system
- (A) Analysis
- (B) Design
- (C) Development
- (D) Maintenance
3. Which of the following is not a factor in the failure of a systems development project?
- (A) Inadequate
user involvement
- (B) Failure
of systems integration
- (C) Size
of company
- (D) Continuation
of a project that should have been cancelled
4. Procedure development occurs within the
- (A) Structured
design phase
- (B) Conversion
phase
- (C) System
building phase
- (D) Maintenance
5. Rapid prototyping proves the quality of a design by
- (A) Having
a program simulate the real system
- (B) Having
the system analyst present an overview of the design to users, programmers, and
consultants
- (C) Having a
data flow diagram
- (D) Both (a) and
(b)
6. Structured design methodology is an approach to design that adheres to rales based on principles such as
- (A) Top-down
refinement
- (B) Bottom-up
design
- (C) Data
flow analysis
- (D) All of the
above
7. Pointers are useful in
- (A) Locating
a particular sector of a magnetic disk
- (B) Pointing
mistakes in input data
- (C) Traversing a
linked list
- (D) All of the
above
8. An open rectangle
- (A) Defines
a source or destination of system data
- (B) Identifies
data flow
- (C) Represents
a process that transforms incoming data flow(s) into outgoing data flows
- (D) Is a data
store-data at rest, or a temporary repository of data
9. Data structuring is refined through a process called
- (A) Structuring
process
- (B) Hierarchical
structure
- (C) Normalization
- (D) Relation
structure
10. The term used to refer to the checking of outputs of a computer, with the corresponding input documents, is called
- (A) Auditing
around the computer
- (B) Auditing
through the computer
- (C) Process
control
- (D) Beta-test
11. The systems conversion technique of totally removing the existing system and immediately implementing the new system is called a
- (A) Pilot
conversion
- (B) Crash
conversion
- (C) Phased
conversion
- (D) Parallel run
12. Mistakes made in the requirements analysis stage show up in
- (A) System
design
- (B) System
development
- (C) System
testing
- (D) System
implementation
13. Announcement of MIS implementation is made by
- (A) Operational
level managers
- (B) Tactical
level managers
- (C) The
president
- (D) All of the
above
14. A system design is said to be functionally modular if
- (A) The
system is able to handle all the function of the application
- (B) Each
module performs a specific function and can be developed relatively
independently by programmers
- (C) The
system makes extensive use of function keys for maximum user assistance
- (D) The
system is developed using structured programming through COBOL or PASCAL
15. In top down analysis and design
- (A) Each
succeeding phase is more detailed than the phase before it
- (B) Each
succeeding phase is as detailed as the phase before it
- (C) Each
succeeding phase is less detailed than the phase before it
- (D) All of the
above
Next Tests: