Practice Test: Question Set - 01
1. Which window is provided on sloping roof?
- (A) Table Window
- (B) Lantern
Window
- (C) Dormer
Window
- (D) Clerestory
Window
2. Which window is provided near the top of main roof?
- (A) Panelled
Window
- (B) Casement
Window
- (C) Clerestory Window
- (D) Table Window
3. What bench mark is established for short duration such as at the end of a days work?
- (A) Arbitrary
bench mark
- (B) Temporary
bench mark
- (C) Permanent
bench mark
- (D) GTS bench
mark
4. What is the smallest graduated division in levelling staff?
- (A) 0.5 m
- (B) 0.05 m
- (C) 0.005 m
- (D) 0.0005 m
5. What is the name of the imaginary line of constant elevation on the ground surface?
- (A) Relief
- (B) Contour line
- (C) Contouring
line
- (D) Contour
interval
6. What dimensions are drawn in a plan of contour?
- (A) Vertical
dimension
- (B) Horizontal
dimension
- (C) Inclined
dimension
- (D) Parallel
dimension
7. What is referred to smallest measureable unit in theodolite?
- (A) Double
sighting
- (B) Least count
- (C) Swing
- (D) Contouring
8. What is the technical term for the process of bring the vertical axis of theodolite immediately over a mark or station point?
- (A) Cantering
- (B) Traversing
- (C) Non - Traversing
- (D) Collimation
9. What is the method of prolongation of a straight line that result cumulative errors, if the instrument is not in adjustment?
- (A) Prolonging a
line by first method
- (B) Prolonging a
line by second method
- (C) Prolonging a
line by third method
- (D) Prolonging a
line by fourth method
10. What is the name of the staff used while the sights are long and the reading viewed through instrument?
- (A) Solid staff
- (B) Invar staff
- (C) Target staff
- (D) Telescopic
staff
11. What is the test carried in theodolite to make the plate bubbles centre to run if the vertical axis is truly vertical?
- (A) Spine test
- (B) Plate level
test
- (C) Collimation
test
- (D) Bubble tube
adjustment
12. What is the name of level designated as self aligning level?
- (A) Tilting
level
- (B) Auto level
- (C) Dumpy level
- (D) Wye (Y)
level
13. What is the name of survey done after balancing traverse?
- (A) Offset
survey
- (B) Radial
survey
- (C) Plotting a
traverse survey
- (D) Bowditch’s
method