Practice Test: Question Set - 01
1. Which estimate is prepared while the original sanctioned estimate is exceeded by more than 5%?
- (A) Supplementary
- (B) Extension
and improvement
- (C) Revised
- (D) Plinth area
2. What is the minimum area for bill quantity calculation?
- (A) 1 mm2
- (B) 1 cm2
- (C) 0.01 sq.m
- (D) 1 m2
3. What is the unit for steel reinforcement bars etc in RCC, RB work in MKS system?
- (A) m
- (B) Nos.
- (C) Quintal
- (D) sq.m
4. What (%) percentage of steel work is provided for rivets in steel roof truss?
- (A) 3%
- (B) 5%
- (C) 7%
- (D) 10%
5. What is the name given to built up area of building measured at floor level of any storey?
- (A) Plinth area
- (B) Floor area
- (C) Circulation
area
- (D) Carpet area
6. Which is rough cost estimate?
- (A) Revised
estimate
- (B) Annual
repair estimate
- (C) Plinth area
estimate
- (D) Supplementary
estimate
7. What is the minimum lift for earthwork excavation?
- (A) 1 m
- (B) 1.5 m
- (C) 2.0 m
- (D) 3.0 m
8. What is the scale range used for the preparation of layout plan?
- (A) 1 cm = 5 m
to 1 cm = 10 m
- (B) 1 cm = 10 m
to 1 cm = 20 m
- (C) 1 cm = 0.5
km to 1 cm = 1 km
- (D) 1 cm = 5 km
to 1 cm = 10 km
9. Which brick structure is measured in sq.m?
- (A) Reinforced
brick work
- (B) Broken glass
coping
- (C) Concrete
fencing posts
- (D) Brick work
in arches
10. What is the minimum area for bill quantity calculation?
- (A) 1 mm2
- (B) 1 cm2
- (C) 0.01 sq.m
- (D) 1 m2
11. What is the unit for brick work in cement mortar for superstructure in MKS system?
- (A) m
- (B) sq.m
- (C) cu.m
- (D) Nos.
12. What is the minimum lift for earthwork excavation?
- (A) 1 m
- (B) 1.5 m
- (C) 2.0 m
- (D) 3.0 m
13. Which estimate is prepared while the expenditure on a work exceeds by more than 10%?
- (A) Supplementary
- (B) Revised
- (C) Annual
repair
- (D) Cubical
content
14. Which is rough cost estimate?
- (A) Revised
estimate
- (B) Annual
repair estimate
- (C) Plinth area
estimate
- (D) Supplementary
estimate
15. What is the name given to build up area of building measured at floor level of any storey?
- (A) Plinth area
- (B) Floor area
- (C) Circulation
area
- (D) Carpet area