1. Which estimate is prepared while the original sanctioned estimate is exceeded by more than 5%?
    (A) Supplementary
    (B) Extension and improvement
    (C) Revised
    (D) Plinth area

2. What is the minimum area for bill quantity calculation?
    (A) 1 mm2
    (B) 1 cm2
    (C) 0.01 sq.m
    (D) 1 m2

3. What is the unit for steel reinforcement bars etc in RCC, RB work in MKS system?
    (A) m
    (B) Nos.
    (C) Quintal
    (D) sq.m

4. What (%) percentage of steel work is provided for rivets in steel roof truss?
    (A) 3%
    (B) 5%
    (C) 7%
    (D) 10% 

5. What is the name given to built up area of building measured at floor level of any storey?
    (A) Plinth area
    (B) Floor area
    (C) Circulation area
    (D) Carpet area 

6. Which is rough cost estimate?
    (A) Revised estimate
    (B) Annual repair estimate
    (C) Plinth area estimate
    (D) Supplementary estimate

7. What is the minimum lift for earthwork excavation?
    (A) 1 m
    (B) 1.5 m
    (C) 2.0 m
    (D) 3.0 m

8. What is the scale range used for the preparation of layout plan?
    (A) 1 cm = 5 m to 1 cm = 10 m
    (B) 1 cm = 10 m to 1 cm = 20 m
    (C) 1 cm = 0.5 km to 1 cm = 1 km
    (D) 1 cm = 5 km to 1 cm = 10 km

9. Which brick structure is measured in sq.m?
    (A) Reinforced brick work
    (B) Broken glass coping
    (C) Concrete fencing posts
    (D) Brick work in arches

10. What is the minimum area for bill quantity calculation?
    (A) 1 mm2
    (B) 1 cm2
    (C) 0.01 sq.m
    (D) 1 m2

11. What is the unit for brick work in cement mortar for superstructure in MKS system?
    (A) m
    (B) sq.m
    (C) cu.m
    (D) Nos. 

12. What is the minimum lift for earthwork excavation?
    (A) 1 m
    (B) 1.5 m
    (C) 2.0 m
    (D) 3.0 m 

13. Which estimate is prepared while the expenditure on a work exceeds by more than 10%?
    (A) Supplementary
    (B) Revised
    (C) Annual repair
    (D) Cubical content 

14. Which is rough cost estimate?
    (A) Revised estimate
    (B) Annual repair estimate
    (C) Plinth area estimate
    (D) Supplementary estimate

15. What is the name given to build up area of building measured at floor level of any storey?
    (A) Plinth area
    (B) Floor area
    (C) Circulation area
    (D) Carpet area