1. Which is the graphical representation of average rainfall between rainfall excess?
    (A) Hyetograph
    (B) Hydrograph
    (C) S-hydrograph
    (D) Unit hydrograph

2. What is the name of dam?
Irrigation Engineering Draughtsman Civil
    (A) Rock fill dam
    (B) Concrete buttress dam
    (C) Earth dam
    (D) Combined Earth and Rock dam 

3. What is the name for accumulation of water in the form of an artificial lake?
    (A) Spill ways
    (B) Barrages
    (C) Reservoir
    (D) Groynes

4. When does hydrograph called as unit hydrograph?
    (A) 1 cm of runoff from rainfall
    (B) 3 cm of runoff from rainfall
    (C) 1 mm of runoff from rainfall
    (D) 3 mm of runoff from rainfall

5. What is the name of the impervious barrier constructed across a perennial river to raise the water level on the upstream side?
    (A) Barrage
    (B) Weir
    (C) Notch
    (D) Mouth piece 

6. Which underground water nourishes the plant roots by capillarity?
    (A) Subsurface
    (B) Surface
    (C) Flood
    (D) Flow 

7. Which is the main factor for selection of site for a reservoir?
    (A) Maximum runoff
    (B) Maximum percolation
    (C) Wide opening
    (D) Minimum runoff

8. What is the name of the impervious barrier constructed across a perennial river to raise the water level on the upstream side?
    (A) Barrage
    (B) Weir
    (C) Notch
    (D) Mouth piece

9. Which underground water nourishes the plant roots by capillarity?
    (A) Subsurface
    (B) Surface
    (C) Flood
    (D) Flow

10. Which crops are sown in autumn in harvested in spring?
    (A) Kharif
    (B) Autumn
    (C) Rabi
    (D) South west monsoon

11. Which crops are sown in autumn in harvested in spring?
    (A) Kharif
    (B) Autumn
    (C) Rabi
    (D) South west monsoon

12. What is the first watering before sowing the crop?
    (A) Kor watering
    (B) Paleo
    (C) Delta
    (D) Duty 

13. Which catchment area run off will be more?
    (A) Fan shaped
    (B) Tree shaped
    (C) Fern shaped
    (D) Circular

14. Which construction is at the head of the canal to divert the river water towards the canal?
    (A) Storage head work
    (B) Diversion head work
    (C) Barrage
    (D) Weir

15. What is the life period of thermal plant?
    (A) Less than 30 years
    (B) More than 30 years
    (C) Less than 50 years
    (D) More than 50 years

16. Where did the surplus water in weir is allowed to flow?
    (A) Gates
    (B) Crest
    (C) Spill way
    (D) Openings