Practice Test: Question Set - 01
1. Which of the following is the advantage of prefabricated structures?
- (A) Transportation
- (B) Need of
heavy duty cranes
- (C) Deformation
of joints
- (D) No need of
fastening
2. Which system facilitates assembling of minor elements in conventional construction?
- (A) Open prefab
system
- (B) Partial
prefab system
- (C) Full prefab
system
- (D) Closed
prefab system
3. What is the disadvantage in prefabricated structure?
- (A) Shorter
construction time
- (B) Financial
savings
- (C) Reduced site
disruption
- (D) Transportation
4. What is the scale used for prefabricated structure?
- (A) IS 15913 -
2011
- (B) IS 15914 -
2011
- (C) IS 15915 -
2011
- (D) IS 15916 -
2011
5. Which section provides one monotitic action between prefabricated units?
- (A) Composite
- (B) Steel
- (C) Tensile
- (D) Compression
6. What is the first stage of prefabricated structure construction?
- (A) Testing of
raw materials
- (B) Procurement
of raw materials
- (C) Concrete mix
design
- (D) Reinforcement
preparation
7. What is the advantage of prefabricated structure?
- (A) Transportation
- (B) No need of
heavy duty cranes
- (C) Firm joints
- (D) Mass
production
8. What is the name of assembling structural components at site?
- (A) Open prefab
system
- (B) Partial
prefab system
- (C) Full prefab
system
- (D) Closed
prefab system
9. What is the another name for pre-fabricated structures?
- (A) Pre-developed
structures
- (B) Modular
structures
- (C) High
structures
- (D) Site fixing
structures
10. Which system is used with double tee slaps for precast beams and walls?
- (A) Load bearing
- (B) Non load
bearing
- (C) Framed
structures
- (D) Foundation
11. Which part of the prefabricated building structure is to be constructed at site?
- (A) Roof slab
- (B) Foundation
- (C) Main beams
- (D) Fillers
12. What is the name of the concrete that are prepared at factory and erected at site?
- (A) Pre-stressed
concrete
- (B) Post-tensioned
concrete
- (C) Pre-casted
concrete
- (D) Post-casted
concrete
13. What is the name of the prefabricating method?
- (A) Flow method
- (B) Fixed method
- (C) Stand method
- (D) Hand method
14. What is the procedure to attain complete action between stem and flange?
- (A) Laced
together
- (B) Tied
together
- (C) Keyed
together
- (D) Cutted
together
15. Which is the production of housing components using factory mechanization?
- (A) Prefabrication
- (B) Fabrication
- (C) Construction
- (D) Production
16. Which prefabricated method the units of moved to various section for process?
- (A) Flow method
- (B) Fixed method
- (C) Stand method
- (D) Vehicle
method
17. Which of the following concrete require transportation for placing?
- (A) In site
concrete
- (B) Post
tensioned concrete
- (C) Pre cast
concrete
- (D) Pre-stressed
concrete