Practice Test: Question Set - 01


1. Which of the following is the advantage of prefabricated structures?
    (A) Transportation
    (B) Need of heavy duty cranes
    (C) Deformation of joints
    (D) No need of fastening

2. Which system facilitates assembling of minor elements in conventional construction?
    (A) Open prefab system
    (B) Partial prefab system
    (C) Full prefab system
    (D) Closed prefab system

3. What is the disadvantage in prefabricated structure?
    (A) Shorter construction time
    (B) Financial savings
    (C) Reduced site disruption
    (D) Transportation

4. What is the scale used for prefabricated structure?
    (A) IS 15913 - 2011
    (B) IS 15914 - 2011
    (C) IS 15915 - 2011
    (D) IS 15916 - 2011

5. Which section provides one monotitic action between prefabricated units?
    (A) Composite
    (B) Steel
    (C) Tensile
    (D) Compression

6. What is the first stage of prefabricated structure construction?

    (A) Testing of raw materials
    (B) Procurement of raw materials
    (C) Concrete mix design
    (D) Reinforcement preparation

7. What is the advantage of prefabricated structure?
    (A) Transportation
    (B) No need of heavy duty cranes
    (C) Firm joints
    (D) Mass production

8. What is the name of assembling structural components at site?
    (A) Open prefab system
    (B) Partial prefab system
    (C) Full prefab system
    (D) Closed prefab system

9. What is the another name for pre-fabricated structures?
    (A) Pre-developed structures
    (B) Modular structures
    (C) High structures
    (D) Site fixing structures

10. Which system is used with double tee slaps for precast beams and walls?
    (A) Load bearing
    (B) Non load bearing
    (C) Framed structures
    (D) Foundation

11. Which part of the prefabricated building structure is to be constructed at site?
    (A) Roof slab
    (B) Foundation
    (C) Main beams
    (D) Fillers

12. What is the name of the concrete that are prepared at factory and erected at site?
    (A) Pre-stressed concrete
    (B) Post-tensioned concrete
    (C) Pre-casted concrete
    (D) Post-casted concrete

13. What is the name of the prefabricating method?
    (A) Flow method
    (B) Fixed method
    (C) Stand method
    (D) Hand method

14. What is the procedure to attain complete action between stem and flange?
    (A) Laced together
    (B) Tied together
    (C) Keyed together
    (D) Cutted together

15. Which is the production of housing components using factory mechanization?
    (A) Prefabrication
    (B) Fabrication
    (C) Construction
    (D) Production

16. Which prefabricated method the units of moved to various section for process?
    (A) Flow method
    (B) Fixed method
    (C) Stand method
    (D) Vehicle method

17. Which of the following concrete require transportation for placing?
    (A) In site concrete
    (B) Post tensioned concrete
    (C) Pre cast concrete
    (D) Pre-stressed concrete