Practice Test: Question Set - 03
1. What is the name for raising of the level of the outer rail over that of inner rail?
- (A) Creep
- (B) Cant
- (C) Boxing
- (D) Wearing
2. What is the minimum spacing between sleepers in broad gauge?
- (A) 200 mm
- (B) 250 mm
- (C) 300 mm
- (D) 500 mm
3. Which direction does rail creep occurs?
- (A) Longitudinal
- (B) Lateral
- (C) Vertical
- (D) Transverse
4. What is the minimum spacing between sleepers in broad gauge?
- (A) 200 mm
- (B) 250 mm
- (C) 300 mm
- (D) 500 mm
5. Which warner signal is first seen by the driver in railway station?
- (A) Disc signal
- (B) Home signal
- (C) Outer signal
- (D) Routing
signal
6. Which direction does rail creep occurs?
- (A) Longitudinal
- (B) Lateral
- (C) Vertical
- (D) Transverse
7. What is the process of tightly ramming the ballast under the sleepers to transmit the load?
- (A) Packing
- (B) Laying
- (C) Boxing
- (D) Fixing
8. What is the width of broad gauge?
- (A) 0.16 m
- (B) 0.762 m
- (C) 1.00 m
- (D) 1.676 m
9. Which is used for joining the rail?
- (A) Spikes
- (B) Rail chairs
- (C) Fish plates
- (D) Bearing
plate
10. What is the process for filling the ballast around the sleepers?
- (A) Creep
- (B) Turn table
- (C) Boxing
- (D) Coning
11. Which is a cast iron sleeper?
- (A) Duplex
- (B) Steel
- (C) Pot
- (D) Box
12. What is the name for raising of the level of the outer rail over that of inner rail?
- (A) Creep
- (B) Cant
- (C) Boxing
- (D) Wearing
Next Tests:
Blogger Comment
Facebook Comment